Home Portfolio 2005 St. Petersburg beltway (1st phase): INSTALLATION OF NOISE BARRIER

St. Petersburg beltway (1st phase): INSTALLATION OF NOISE BARRIER

ST. PETERSBURG BELTWAY (1st PHASE):

INSTALLATION OF NOISE BARRIER Н=4,0 m L=500 linear meters –

EXIT FROM THE CABLE STAYED BRIDGE (THE RIGHT BANK)

foto06_01

foto06_02

Noise barrier, general view

foto06_03

Noise barrier panel

foto06_04

Cable stayed bridge exit (the Right Bank)

foto06_05

Cable stayed bridge exit (the Right Bank)